Difference between revisions of "Category: Mature Water Flood Analysis"

From wiki.pengtools.com
Jump to: navigation, search
(Workflow)
Line 15: Line 15:
 
#Upload the required data
 
#Upload the required data
 
#Gridding - Divide the field into [[Pattern]]s/[[Block]]s/[[Bucket]]s using the [[Bubble map]]
 
#Gridding - Divide the field into [[Pattern]]s/[[Block]]s/[[Bucket]]s using the [[Bubble map]]
#Calculate STOIIP for each reservoir using blocks
+
#Calculate [[HCPV]], [[HCPVinj]], RF, VRR, VRRcum for each reservoir using blocks
#Match STOIIP to official numbers by changing the edge [[Block]]s areas
+
#Match total [[HCPV]] to [[STOIIP]] numbers by changing the edge [[Block]]s areas
#Make Plots (by field, by reservoir, by block):History, RF vs HCPVinj, RF vs well spacing, [[WOR vs Np]], VRR vs t
+
#Make Plots (by field, by reservoir, by block): History, RF vs HCPVinj, RF vs well spacing, [[WOR vs Np]], VRR vs t
 
#Make Maps (by reservoir) showing Blocks: HCPV, HCPVinj, RF, VRR
 
#Make Maps (by reservoir) showing Blocks: HCPV, HCPVinj, RF, VRR
 
#Make Cross sections
 
#Make Cross sections

Revision as of 16:11, 21 March 2022

Brief

Mature Water Flood Analysis is a workflow for identifying the performance gaps in the mature waterfloods performance.

Mature Water Flood Analysis is applied to the Reservoirs and uses Monthly Measures for production/injection data.

MWFA

As a result Mature Water Flood Analysis generates Blocks/Patterns Enhancement List.

Block Enhancement List

Workflow

  1. Upload the required data
  2. Gridding - Divide the field into Patterns/Blocks/Buckets using the Bubble map
  3. Calculate HCPV, HCPVinj, RF, VRR, VRRcum for each reservoir using blocks
  4. Match total HCPV to STOIIP numbers by changing the edge Blocks areas
  5. Make Plots (by field, by reservoir, by block): History, RF vs HCPVinj, RF vs well spacing, WOR vs Np, VRR vs t
  6. Make Maps (by reservoir) showing Blocks: HCPV, HCPVinj, RF, VRR
  7. Make Cross sections
  8. Calculate Blocks Enhancement List
  9. Create Action List
  10. Execute


Repeat steps 5-6-7-8-9-10 routinely (monthly, quarterly, half year).

Data Required

Action List

The typical actions are:

  • Convert producing well to injector
  • Shut in inefficient injection well
  • Increase/Decrease well injection rate
  • Add/squeeze Perforations at producing or injection wells
  • Drill infill production/injection well

References

Wolcott, D. ; Applied Waterflood Field Development, Energy Tribune Publishing Inc., 2009.


Pages in category "Mature Water Flood Analysis"

The following 12 pages are in this category, out of 12 total.