Difference between revisions of "Category: Enhancement List"

From wiki.pengtools.com
Jump to: navigation, search
(WHP and WOP)
 
(41 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
Routine execution of the identified [[Enhancement| Enhancements]] unlocks the pathway to [[Production Potential]] and results in more production, improved recovery and increased earnings.
 
Routine execution of the identified [[Enhancement| Enhancements]] unlocks the pathway to [[Production Potential]] and results in more production, improved recovery and increased earnings.
  
[[File:Enhancement List.png| Enhancement List]]
+
[[File:Enhancement List.jpeg| Enhancement List]]
 +
 
 +
<center>[[:Category:Enhancement List | Enhancement List]] at the [[:Category:E&P Portal | E&P Portal]]</center>
  
 
==Workflow==
 
==Workflow==
  
First [[Production Potential]] is calculated:
+
===1. Current Performance===
 +
[[:Category:Enhancement List | Enhancement List]] requires a lot of data been measured and processed and without an automated system a lot of manual work.
 +
 
 +
The minimum required data set is:
 +
 
 +
*[[Field]]
 +
*[[Reservoirs]] and [[PVT]]
 +
*[[Well]]
 +
*Well Type (producer, injector, history of change)
 +
*Well Operation Type (flowing, artificial list, history of change)
 +
*[[Daily Measures | Well Daily Measures]] (specifically flowing rates, fluid levels, pressures)
 +
*[[Deviation Survey]]
 +
*[[Perforations]]
 +
*kh & JD
 +
*Well Downhole Equipment
 +
*Well Design
 +
 
 +
===2. Production Potential===
  
===WHP and WOP===
+
[[Production Potential]] is calculated:
 +
 
 +
====WHP and WOP====
  
 
* '''Wellhead Potential (WHP)''' - is the maximum rate that can be achieved with existing well equipment with no workover (Choke open, Speedup the ESP, etc).
 
* '''Wellhead Potential (WHP)''' - is the maximum rate that can be achieved with existing well equipment with no workover (Choke open, Speedup the ESP, etc).
 +
 
* '''Workover Potential (WOP)''' - is the maximum rate that can be achieved with workover. The assumption is that the current skin will be mitigated with better completion during the workover. And the largest tubing practical that will fit in the current well bore will be used.
 
* '''Workover Potential (WOP)''' - is the maximum rate that can be achieved with workover. The assumption is that the current skin will be mitigated with better completion during the workover. And the largest tubing practical that will fit in the current well bore will be used.
  
Line 33: Line 55:
 
<td>Flowing</td>
 
<td>Flowing</td>
 
<td> Calculated with Nodal Analysis using the [[PQplot]] by setting the flowing wellhead pressure (FWHP) equal to the current flowing line pressure (FLP) at the well head. <BR>Use the current value of [[JD]].</td>
 
<td> Calculated with Nodal Analysis using the [[PQplot]] by setting the flowing wellhead pressure (FWHP) equal to the current flowing line pressure (FLP) at the well head. <BR>Use the current value of [[JD]].</td>
<td> Calculated with Nodal Analysis using the [[PQplot]] by using the largest tubing practical that will fit in the current well bore with a FWHP equal to the current FLP. The largest tubing size is approximately the casing drift diameter minus the tubing coupling diameter > 0.5 inches for clearance (see [[Pipe Catalog]]).<BR>If [[JD]]<0.13 [[JD]]=0.13 else [[JD]]. </td>
+
<td> Calculated with Nodal Analysis using the [[PQplot]] by using the largest tubing practical that will fit in the current well bore with a FWHP equal to the current FLP. The largest tubing size is approximately the casing drift diameter minus the tubing coupling diameter > 0.5 inches for clearance (see [[Pipe Catalog]]).<BR>Use [[JD]]=0.13.</td>
 
</tr>
 
</tr>
  
Line 39: Line 61:
 
<td>Oil</td>
 
<td>Oil</td>
 
<td>Flowing</td>
 
<td>Flowing</td>
<td>Calculated same as for the '''Gas Flowing''' case</td>
+
<td>Calculated the same way as for the '''Gas Flowing''' case</td>
<td>Calculated as absolute open flow (AOF).<BR>If [[JD]]<1.27 then [[JD]]=1.27 else [[JD]].</td>
+
<td>Calculated as absolute open flow (AOF).<BR>Use [[JD]]=1.27.</td>
 
</tr>
 
</tr>
  
Line 47: Line 69:
 
<td>Artificial Lift (ESP, Rod Pump, PCP)</td>
 
<td>Artificial Lift (ESP, Rod Pump, PCP)</td>
 
<td>Calculated by setting the flowing bottomhole pressure (Pwf) equal to the fluid level at the pump depth.<BR>Use the current value of [[JD]].</td>
 
<td>Calculated by setting the flowing bottomhole pressure (Pwf) equal to the fluid level at the pump depth.<BR>Use the current value of [[JD]].</td>
<td>Calculated as absolute open flow (AOF).<BR>If [[JD]]<1.27 then [[JD]]=1.27 else [[JD]].</td>
+
<td>Calculated as absolute open flow (AOF).<BR>Use [[JD]]=1.27. <BR>Note: If WOP > all lift capacities thats good, must engineer a higher performance system.</td>
 
</tr>
 
</tr>
  
 
</table>
 
</table>
  
 +
===3. Enhancement Opportunities and Execution===
 +
[[Enhancement| Enhancement opportunities]] are identified by calculating the performance gap deriving from the difference between the [[Production Potential]] and actual well rates.
  
"WO POTENTIAL" is calculated by using the largest tubing practical that will fit in the current well bore with a WHP equal to current line pressure.  
+
Then list of opportunities is ranked by production increments.  
  
две ветки:
+
As a result, the [[:category:Enhancement List | Well Enhancement List]] is generated with the best candidate on the top.
flowing (tub, ann, tub+ann)
 
not flowing (или ESP или PCP и тп)
 
две категории:
 
ENHANCED
 
WO ENHANCED
 
по flowing:
 
ENHANCED - так же как в Gas Enh List
 
WO ENHANCED - AOF
 
по not flowing:
 
ENHANCED - считаем BHP при Hd=Htub, считаем ql для этого BHP через IPR
 
WO ENHANCED - AOF
 
для JD при расчете AOF:
 
GAS - if JD<0.13 JD=0.13 else JD
 
OIL - if JD<1.27 then JD=1.27 else JD
 
  
Misha, I think that we need two
+
The performance gaps are closed by executing the [[Enhancement| Enhancements]].
potential calculations(columns)
 
for flowing wells:
 
  
1. "WHP POTENTIAL" is calculated
+
The success is tracked by [[Enhancement Tracking]] workflow.
      by by setting the WHP equal
 
      to the current line pressure at the
 
      well head. Use estimated current
 
      Jd.
 
  
2. "WO POTENTIAL" is calculated by
+
==Discussion==
      using the largest tubing practical
+
[[:Category:Enhancement List | Enhancement List]] compiles the proven to work technologies into a practical management tool. It's implemented as a programing code of algorithms of the [[:Category:E&P Portal | E&P Portal]]. The code can be set up in the company database or in the cloud so that [[:Category:Enhancement List | Enhancement List]] will be automatically calculated on a daily basis. Such implementation allows management and engineers know and manage the [[Production Potential]] in real time.
      that will fit in the current well bore
 
      with a WHP equal to current line
 
      pressure. Use a Jd ~ 0.13. The
 
      assumption is that we will mitigate
 
      the current skin with better
 
      completion during the workover.  
 
      The largest tubing size is
 
      approximately the casing drift
 
      diameter minus the tubing
 
      coupling diameter > 0.75
 
      Inches for clearance. Then
 
      convert this to the nearest
 
      standard tubing OD, 2 7/8, 3 1/2,
 
      4, 4 1/2, 5, 5 1/2, 6, 6 5/8, 7,
 
      7 5/8, etc,
 
  
The potential gap should be sorted
+
==See also==
based on the "WHP POTENTIAL"
+
[[Maximizing Petroleum Reservoir Production Using Gap Analysis]]
since this is the easiest and cheapest
+
[[Category:E&P Portal]]
enhancement to execute.
 
 
 
Your horseshoe should be based
 
on the "WO POTENTIAL" since this
 
Is the actual potential of the currently
 
constructed well bore.
 
 
 
You should always display AOFs
 
in one of the columns.
 
 
 
These rules apply to all flowing
 
wells unless the workover installs
 
artificial lift of some sort.
 
 
 
Artificial lift is a different sheet and
 
we can spec it later, since it doesn't
 
apply to us at this time.
 
 
 
 
 
There should be on two categories,
 
current and enhanced.
 
 
 
Enhanced is Jdfrac=1.0, Pwf=fluid
 
level at pump depth, Pipe=big.
 
 
 
If enhanced q > all lift capacities
 
that good, must engineer a higher
 
performance system.
 
  
For enhanced we used the AOF at
+
{{#seo:
Yukos.
+
|title=Oil and Gas Production Enhancement List
 
+
|titlemode= replace
Need to develop a simple algorithm
+
|keywords=Production Enhancement, Oil and Gas
for Jd. You can't get Jd=1 for high
+
|description=Enhancement List is raking of oil and gas well enhancements with the best on the top.
k wells. Look at Cfd vs Np, etc to
+
}}
develop simple "estimate" algorithm.
 
 
 
[[Production Potential]] is used to rank the [[Enhancement | Enhancements]].
 
 
 
 
 
 
 
 
 
[[Category:E&P Portal]]
 

Latest revision as of 08:22, 5 September 2019

Brief

Enhancement List is a workflow for identifying the performance gaps based on the Gap Analysis.

The workflow produces the Enhancement List which is a ranking of the Enhancements with the best on the top.

Routine execution of the identified Enhancements unlocks the pathway to Production Potential and results in more production, improved recovery and increased earnings.

Enhancement List

Enhancement List at the E&P Portal

Workflow

1. Current Performance

Enhancement List requires a lot of data been measured and processed and without an automated system a lot of manual work.

The minimum required data set is:

2. Production Potential

Production Potential is calculated:

WHP and WOP

  • Wellhead Potential (WHP) - is the maximum rate that can be achieved with existing well equipment with no workover (Choke open, Speedup the ESP, etc).
  • Workover Potential (WOP) - is the maximum rate that can be achieved with workover. The assumption is that the current skin will be mitigated with better completion during the workover. And the largest tubing practical that will fit in the current well bore will be used.

Below is the Production Potential calculation logic of the E&P Portal:

Well Primary Fluid Well Operating Type Wellhead Potential (WHP) Workover Potential (WOP)
Gas Flowing Calculated with Nodal Analysis using the PQplot by setting the flowing wellhead pressure (FWHP) equal to the current flowing line pressure (FLP) at the well head.
Use the current value of JD.
Calculated with Nodal Analysis using the PQplot by using the largest tubing practical that will fit in the current well bore with a FWHP equal to the current FLP. The largest tubing size is approximately the casing drift diameter minus the tubing coupling diameter > 0.5 inches for clearance (see Pipe Catalog).
Use JD=0.13.
Oil Flowing Calculated the same way as for the Gas Flowing case Calculated as absolute open flow (AOF).
Use JD=1.27.
Oil Artificial Lift (ESP, Rod Pump, PCP) Calculated by setting the flowing bottomhole pressure (Pwf) equal to the fluid level at the pump depth.
Use the current value of JD.
Calculated as absolute open flow (AOF).
Use JD=1.27.
Note: If WOP > all lift capacities thats good, must engineer a higher performance system.

3. Enhancement Opportunities and Execution

Enhancement opportunities are identified by calculating the performance gap deriving from the difference between the Production Potential and actual well rates.

Then list of opportunities is ranked by production increments.

As a result, the Well Enhancement List is generated with the best candidate on the top.

The performance gaps are closed by executing the Enhancements.

The success is tracked by Enhancement Tracking workflow.

Discussion

Enhancement List compiles the proven to work technologies into a practical management tool. It's implemented as a programing code of algorithms of the E&P Portal. The code can be set up in the company database or in the cloud so that Enhancement List will be automatically calculated on a daily basis. Such implementation allows management and engineers know and manage the Production Potential in real time.

See also

Maximizing Petroleum Reservoir Production Using Gap Analysis

Pages in category "Enhancement List"

The following 5 pages are in this category, out of 5 total.