Category: Reservoir Management
From wiki.pengtools.com
Contents
Brief
The primary goal of petroleum Reservoir Management is to produce Wells and Reservoirs at their potential in a most economical way.
Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.
Reservoir Management is applied to the Reservoirs / Objects on a Fields level.
Reservoir Management uses Monthly Measures for production/injection data.
Workflow
- Upload required data
- Completions check
- Group Reservoirs to Objects if needed
- Review the Performance Plots
- History Plot
- Cumulative Production Plots
- Reciprocal Rate Method Plot
- WOR vs Np Plot
- VRR Plot
- VRRcum Plot
- P/Z plot
- Identify Reservoirs / Objects with performance gaps
- Apply the Mature Water Flood Analysis if needed
- Identify the actions required to enhance Reservoirs / Objects production and recovery
- Calculate the Reservoirs / Objects production and recovery forecasts
- Execute
Repeat the steps routinely (monthly, quarterly, half year).
Data required
- Create Field here
- Upload Wells
- Create or Upload Reservoirs here
- Upload Monthly Measures here
- Input the Reservoirs reserves and other data here
- Create or Upload PVT (SG, Pi, Ti) here
In case you need to calculate the Monthly Measures from the Daily Measures:
- Upload Wells
- Upload Daily Measures
- Calculate the Monthly Measures using Monthly Measures Calculator
Pages in category "Reservoir Management"
The following 10 pages are in this category, out of 10 total.