Difference between revisions of "Category: Reservoir Management"
From wiki.pengtools.com
(Created page with "==Reservoir Management== Reservoir Management is a Reservoir Engineering workflow focused on Reservoirs hydrocarbons recovery performance.") |
|||
(13 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | __TOC__ | |
− | [[Reservoir Management]] is a Reservoir | + | ==Brief== |
+ | |||
+ | The primary goal of petroleum [[:Category:Reservoir Management | Reservoir Management]] is to produce [[Well|Wells]] and [[Reservoirs]] at their potential in a most economical way. | ||
+ | |||
+ | [[:Category:Reservoir Management | Reservoir Management]] is a workflow to maximize [[Reservoirs]] hydrocarbons recovery. | ||
+ | |||
+ | [[:Category:Reservoir Management | Reservoir Management]] is applied to the [[Reservoirs]] / [[Object]]s on a [[Field]]s level. | ||
+ | |||
+ | [[:Category:Reservoir Management | Reservoir Management]] uses [[Monthly Measures]] for production/injection data. | ||
+ | |||
+ | [[File:History Plot.png|none|thumb|800px|Reservoir Management: History Plot]] | ||
+ | |||
+ | [[File:Reservoir Management.png|none|thumb|800px|Reservoir Management Table]] | ||
+ | |||
+ | ==Workflow== | ||
+ | #Upload required data | ||
+ | #[[Completions check]] | ||
+ | #Group [[Reservoirs]] to [[Object]]s if needed | ||
+ | #Review the Performance Plots | ||
+ | ##History Plot | ||
+ | ##Cumulative Production Plots | ||
+ | ##[[Reciprocal Rate Method]] Plot | ||
+ | ##[[WOR vs Np]] Plot | ||
+ | ##[[VRR]] Plot | ||
+ | ##[[VRRcum]] Plot | ||
+ | ##[[P/Z plot]] | ||
+ | #Identify [[Reservoirs]] / [[Object]]s with performance gaps | ||
+ | #Apply the [[Mature Water Flood Analysis]] if needed | ||
+ | #Identify the actions required to enhance [[Reservoirs]] / [[Object]]s production and recovery | ||
+ | #Calculate the [[Reservoirs]] / [[Object]]s production and recovery forecasts | ||
+ | # Execute | ||
+ | |||
+ | |||
+ | Repeat the steps routinely (monthly, quarterly, half year). | ||
+ | === Data required=== | ||
+ | |||
+ | {{Data required for Reservoir Management}} | ||
+ | |||
+ | [[Category:E&P Portal]] |
Latest revision as of 10:49, 11 July 2018
Contents
Brief
The primary goal of petroleum Reservoir Management is to produce Wells and Reservoirs at their potential in a most economical way.
Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.
Reservoir Management is applied to the Reservoirs / Objects on a Fields level.
Reservoir Management uses Monthly Measures for production/injection data.
Workflow
- Upload required data
- Completions check
- Group Reservoirs to Objects if needed
- Review the Performance Plots
- History Plot
- Cumulative Production Plots
- Reciprocal Rate Method Plot
- WOR vs Np Plot
- VRR Plot
- VRRcum Plot
- P/Z plot
- Identify Reservoirs / Objects with performance gaps
- Apply the Mature Water Flood Analysis if needed
- Identify the actions required to enhance Reservoirs / Objects production and recovery
- Calculate the Reservoirs / Objects production and recovery forecasts
- Execute
Repeat the steps routinely (monthly, quarterly, half year).
Data required
- Create Field here
- Upload Wells
- Create or Upload Reservoirs here
- Upload Monthly Measures here
- Input the Reservoirs reserves and other data here
- Create or Upload PVT (SG, Pi, Ti) here
In case you need to calculate the Monthly Measures from the Daily Measures:
- Upload Wells
- Upload Daily Measures
- Calculate the Monthly Measures using Monthly Measures Calculator
Pages in category "Reservoir Management"
The following 10 pages are in this category, out of 10 total.