Difference between revisions of "Category: Reservoir Management"

From wiki.pengtools.com
Jump to: navigation, search
(Workflow)
Line 17: Line 17:
 
#[[Completions check]]
 
#[[Completions check]]
 
#Group [[Reservoirs]] to [[Object]]s if needed
 
#Group [[Reservoirs]] to [[Object]]s if needed
#Review Performance Plots
+
#Review the Performance Plots
 
##History Plot
 
##History Plot
 
##Cumulative Production Plots
 
##Cumulative Production Plots
 +
##Reciprocal Rate Method Plot
 
##[[WOR vs Np]] Plot
 
##[[WOR vs Np]] Plot
 
##[[VRR]] Plot
 
##[[VRR]] Plot

Revision as of 08:08, 15 May 2018

Brief

Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.

Reservoir Management is applied to the Reservoirs / Objects on a Fields level.

Reservoir Management uses Monthly Measures for production/injection data.

Reservoir Management: History Plot
Reservoir Management Table

Workflow

  1. Upload required data
  2. Completions check
  3. Group Reservoirs to Objects if needed
  4. Review the Performance Plots
    1. History Plot
    2. Cumulative Production Plots
    3. Reciprocal Rate Method Plot
    4. WOR vs Np Plot
    5. VRR Plot
    6. VRRcum Plot
    7. P/Z plot
  5. Identify Reservoirs / Objects with performance gaps
  6. Apply the Mature Water Flood Analysis if needed
  7. Identify the actions required to enhance Reservoirs / Objects production and recovery
  8. Calculate the Reservoirs / Objects production and recovery forecasts
  9. Execute


Repeat the steps routinely (monthly, quarterly, half year).

Data required

In case you need to calculate the Monthly Measures from the Daily Measures:

Pages in category "Reservoir Management"

The following 10 pages are in this category, out of 10 total.