Difference between revisions of "Production Potential"

From wiki.pengtools.com
Jump to: navigation, search
(Maximum J_D)
(Maximum J_D)
Line 36: Line 36:
 
The maximum possible stimulation potential is pseudo steady linear flow with:
 
The maximum possible stimulation potential is pseudo steady linear flow with:
  
<math>{J_D}_{max}= \frac{6}{\pi} \asymp 1.27 </math>
+
<math>{J_D}_{max}= \frac{6}{\pi} &asymp 1.27 </math>
  
 
== References ==
 
== References ==

Revision as of 13:32, 11 July 2018

Brief

Production Potential is the maximum rate that can be delivered by Well, Pattern, Block or Reservoir.

Math and Physics

The Darcy's law can be written as:

 Q = T \times \Delta P \times J_D

where:

Q is the oil or gas production rate,
T is the Reservoir transmissibility and is given by the Mother Nature,
\Delta P is the Lift System Drawdawn which is set by the operational engineering practices[1],
J_D is the Completion System dimensionless productivity index which is set by the design engineering practices[1].

The rate Q is maximum then \Delta P and J_D are maximum.

Production Potential

Maximum \Delta P

The drawdown is:

\Delta P= \bar P_r - P_{wf}

The maximum drawdown is reached then the flowing bottomhole pressure, P_{wf} = 0, so:

{\Delta P}_{max}= P_r

Maximum J_D

The maximum possible stimulation potential is pseudo steady linear flow with:

Failed to parse (syntax error): {J_D}_{max}= \frac{6}{\pi} &asymp 1.27

References

  1. 1.0 1.1 Wolcott, Don (2009). Applied Waterflood Field DevelopmentPaid subscription required. Houston: Energy Tribune Publishing Inc.