29+ reasons why you can not increase the production

From wiki.pengtools.com
Revision as of 10:15, 17 April 2017 by MishaT (talk | contribs)
Jump to: navigation, search

To safe time pick a number (multiple numbers are acceptable)


1) It's all foam and the well is pumped off!!!

2) Can not produce below the bubble point: IPR curve reverses

3) The hole is too deviated and pumps don't work inlined

4) Pulling the chokes will make production decrease

5) Scale will form

6) Water will break through sooner

7) Anaerobic bacteria will grow at the perforations

8) Facility is full

9) Oil bubbles through water at 30 t/d; the physical production limit

10) Sharp decline of base production

11) Will damage the Reservoir

12) Bad Sucker Rods

13) We don't have big pumps

14) Production below the bubble point will foul the ESP with gas

15) Ran out of cable

16) Bigger pump will cause interference with adjacent wells decreasing total production

17)