Difference between revisions of "VRR"
From wiki.pengtools.com
Line 8: | Line 8: | ||
===Equation=== | ===Equation=== | ||
− | :<math> VRR = \frac{Injected\ reservoir\ volumes}{Produced\ reservoir\ volumes} = \frac{W_i B_{wi} + | + | :<math> VRR = \frac{Injected\ reservoir\ volumes}{Produced\ reservoir\ volumes} = \frac{W_i B_{wi} + G_{gi} B_{gi}}{N_p B_o + W_p B_{wp} + B_g(GOR-R_s)N_p}</math> |
where | where | ||
Line 18: | Line 18: | ||
:<math> B_o </math> = Oil formation volume factor, m3/m3 | :<math> B_o </math> = Oil formation volume factor, m3/m3 | ||
:<math> GOR </math> = Produced gas oil ratio, m3/m3 | :<math> GOR </math> = Produced gas oil ratio, m3/m3 | ||
− | :<math> | + | :<math> G_{gi} </math> = Injected gas volume, m3 |
:<math> N_p </math> = Oil produced, m3 | :<math> N_p </math> = Oil produced, m3 | ||
:<math> R_s </math> = Solution gas oil ratio, m3/m3 | :<math> R_s </math> = Solution gas oil ratio, m3/m3 | ||
Line 32: | Line 32: | ||
*[[Block]] | *[[Block]] | ||
*[[Mature Water Flood Analysis]] | *[[Mature Water Flood Analysis]] | ||
+ | *[[Oil Material Balance]] | ||
[[Category:E&P Portal]] | [[Category:E&P Portal]] |
Revision as of 14:17, 23 March 2022
Contents
Brief
VRR stands for voidage replacement ratio. It is the ratio of injected fluid to produced fluid at the reservoir conditions.
VRR is calculated with the current rates and on the cumulative basis VRRcum.
Equation
where
- = Gas formation volume factor, m3/m3
- = Injected gas formation volume factor, m3/m3
- = Injected water formation volume factor, m3/m3
- = Produced water formation volume factor, m3/m3
- = Oil formation volume factor, m3/m3
- = Produced gas oil ratio, m3/m3
- = Injected gas volume, m3
- = Oil produced, m3
- = Solution gas oil ratio, m3/m3
- = Voidage replacement ratio, fraction
- = Water injected, m3
- = Water produced, m3