Difference between revisions of "P/Z plot"
(→Data Required) |
|||
Line 71: | Line 71: | ||
[[Category:Reservoir Management]] | [[Category:Reservoir Management]] | ||
[[Category:E&P Portal]] | [[Category:E&P Portal]] | ||
+ | |||
+ | {{#seo: | ||
+ | |title=P/Z plot | ||
+ | |titlemode= replace | ||
+ | |keywords=giip calculation, reservoir engineering, material balance, petroleum engineering | ||
+ | |description=P/Z plot is and quick and easy to use tool to estimate reservoirs GIIP. | ||
+ | }} |
Revision as of 05:20, 8 November 2018
Brief
The P/Z plot is a plot of P/z versus Reservoir cumulative gas production, Gp.
The interpretation technique is fitting the data points with the straight line to estimate GIIP.
The P/Z plot is based on the Gas Material Balance equation.
Math & Physics
Applying Real Gas EOS at reservoir conditions:
- (1)
Applying Real Gas EOS at standard conditions:
- (2)
Dividing eq. 2 by eq. 1 and rearranging:
- (3)
Applying eq. 3 for initial conditions and for any point in time:
Applying eq. 3 for any point in time:
Therefore at any time:
Or:
Thus a plot of P/z vs cumulative produced gas is a straight line intersecting X axis at GIIP.
Discussion
P/Z plot is a part of the Reservoir Management workflow in the E&P Portal used to estimate Reservoirs GIIP and recovery.
Example 1. Multiple Reservoirs on the same P/Z plot in the E&P Portal
Gas Flowing Material Balance is the more advanced tool to determine the Reservoirs GIIP and recovery as well as Well's EUR and JD.
Workflow
- Upload the data required
- Go to the Reservoir Management -> Performance Plots
- Select the Reservoirs you want to see and the Data range and click "Search"
- Scroll down the Performance Plots to see the P/Z plot
Data Required
- Create Field here
- Upload Wells
- Create or Upload Reservoirs here
- Upload Monthly Measures here
- Input the Reservoirs reserves and other data here
- Create or Upload PVT (SG, Pi, Ti) here
In case you need to calculate the Monthly Measures from the Daily Measures:
- Upload Wells
- Upload Daily Measures
- Calculate the Monthly Measures using Monthly Measures Calculator
Nomenclature
- = gas initially in place, scf
- = cumulative gas produced, scf
- = reservoir pressure (changing), psia
- = initial reservoir pressure (constant), psia
- = pressure at standard conditions, psia
- = initial reservoir temperature (constant), °R
- = reservoir temperature (constant), °R
- = temperature at standard conditions (constant), °R
- = volume of gas in reservoir converted to standard conditions (changing), scf
- = reservoir volume (constant), ft3
- = gas compressibility factor (changing), dimensionless
- = initial gas compressibility factor (constant), dimensionless