Difference between revisions of "Production Potential"

From wiki.pengtools.com
Jump to: navigation, search
(Math and Physics)
Line 19: Line 19:
  
  
The rate is maximized then <math>\Delta P</math> and <math>J_D</math> are maximized.
+
The rate <math>Q</math> is maximized then <math>\Delta P</math> and <math>J_D</math> are maximized.
  
  
[[File:Production Potental.png| Production Potential]]  
+
[[File:Production Potental.png| Production Potential]]
 
 
  
 
== References ==
 
== References ==

Revision as of 13:14, 11 July 2018

Brief

Production Potential is the maximum rate that can be delivered by Well, Pattern, Block or Reservoir.

Math and Physics

The Darcy's law can be written as:

 Q = T \times \Delta P \times J_D

where:

Q is the oil or gas production rate,
T is the Reservoir transmissibility and is given by the Mother Nature,
\Delta P is the Lift System Drawdawn which is set by the operational engineering practices[1],
J_D is the Completion System dimensionless productivity index which is set by the design engineering practices[1].


The rate Q is maximized then \Delta P and J_D are maximized.


Production Potential

References

  1. 1.0 1.1 Wolcott, Don (2009). Applied Waterflood Field DevelopmentPaid subscription required. Houston: Energy Tribune Publishing Inc.