Difference between revisions of "Production Potential"

From wiki.pengtools.com
Jump to: navigation, search
(Maximum J_D)
Line 19: Line 19:
  
 
The rate <math>Q</math> is '''maximum''' then <math>\Delta P</math> and <math>J_D</math> are '''maximum'''.
 
The rate <math>Q</math> is '''maximum''' then <math>\Delta P</math> and <math>J_D</math> are '''maximum'''.
 
[[File:Production Potental.png| Production Potential]]
 
  
 
==Maximum <math>\Delta P</math>==
 
==Maximum <math>\Delta P</math>==

Revision as of 13:36, 11 July 2018

Brief

Production Potential is the maximum rate that can be delivered by Well, Pattern, Block or Reservoir.

Math and Physics

The Darcy's law can be written as:

 Q = T \times \Delta P \times J_D

where:

Q is the oil or gas production rate,
T is the Reservoir transmissibility and is given by the Mother Nature,
\Delta P is the Lift System Drawdawn which is set by the operational engineering practices[1],
J_D is the Completion System dimensionless productivity index which is set by the design engineering practices[1].

The rate Q is maximum then \Delta P and J_D are maximum.

Maximum \Delta P

The drawdown is:

\Delta P= \bar P_r - P_{wf}

The maximum drawdown is reached then the flowing bottomhole pressure, P_{wf} = 0, so:

{\Delta P}_{max}= P_r

Maximum J_D

The maximum possible stimulation potential is pseudo steady linear flow with:

{J_D}_{max}= \frac{6}{\pi} \approx 1.91

References

  1. 1.0 1.1 Wolcott, Don (2009). Applied Waterflood Field DevelopmentPaid subscription required. Houston: Energy Tribune Publishing Inc.