Difference between revisions of "Gas Flowing Material Balance"

From wiki.pengtools.com
Jump to: navigation, search
(Nomenclature)
(Subscripts)
Line 80: Line 80:
  
 
:g = gas<BR/>
 
:g = gas<BR/>
 +
:i = initial<BR/>
 
:K = °K<BR/>
 
:K = °K<BR/>
:L = liquid<BR/>
 
:m = gas/liquid mixture<BR/>
 
:o = oil<BR/>
 
 
:R = °R<BR/>
 
:R = °R<BR/>
:SL = superficial liquid<BR/>
+
:wf = well flowing <BR/>
:SG = superficial gas<BR/>
 
:w = water<BR/>
 
  
 
== References ==
 
== References ==

Revision as of 12:17, 11 December 2017

Brief

Gas Flowing Material Balance is the advanced engineering technique to determine the Reservoirs GIIP and recovery as well as Well's EUR and JD.

Gas Flowing Material Balance is applied on the Well level given readily available well flowing data: production rate and tubing head pressure.

The interpretation technique is fitting the data points with the straight line to estimate GIIP and JD.

Math & Physics

Combining the gas pseudo state flow equation and the Gas Material Balance equation to get Gas Flowing Material Balance equation:

 P_{\bar{P}}= P_{P_{wf}} + q_g b_{pss} [1]

where

 b_{pss} = \frac{1422 \times 10^3\ T_R}{kh\ J_D}

Material balance pseudo-time:

 t_{ca} = \frac{\mu_{gi} c_{gi}}{q_g}\int\limits_{0}^{t}\frac{q_g}{\bar{\mu_g} \bar{c_g}}dt

Discussion

well vs reservoir model start

Workflow

  1. Calculate the red  \frac{P}{z} line:
    1. Given the GIIP
    2. Calculate the  \frac{P}{z}=\frac{P_i}{z_i} \left (1- \frac{G_p}{GIIP}\right )
  2. Calculate the orange  \frac{\bar{P}}{z} curve:
    1. Given the flowing wellhead pressures, calculate the flowing bottomhole pressures, P_{wf}
    2. Convert the flowing pressures to pseudopressures, P_{P_{wf}}
    3. Given the JD, calculate the  b_{pss}
    4. Calculate the pseudopressure,  P_{\bar{P}}
    5. Convert the pseudopressure to pressure,  \bar{P}
    6. Calculate the  \frac{\bar{P}}{z}
  3. Calculate the gray JD curve:
    1. Calculate the gas productivity index, J=\frac{q_g}{P_{\bar{P}}-P_{P_{wf}}}
    2. Calculate the JD, J_D=\frac{1422 \times 10^3\ T_R}{kh} J
  4. Change the red  \frac{P}{z} line to match the orange  \frac{\bar{P}}{z} curve
    1. Change the GIIP
    2. Change the intitial  \frac{P}{z}
  5. Change the flat JD gray line to match the changing JD gray line
  6. Save the Gas Flowing Material Balance model
  7. Move to the next well

Extra Plot to find bpss

  1. Calculate the initial pseudopressure, P_{Pi}
  2. Calculate the material balance pseudo-time, t_{ca}
  3. Plot \frac{P_{P_i}-P_{P_{wf}}}{q_g} versus t_{ca}
  4. The intercept with the Y axis gives b_{pss} and J_D

Data required

Nomenclature

 b_{pss} = Reservoir constant, inverse to productivity index, psi2/cP/MMscfd
 GIIP = gas initially in place, MMscf
 G_p = cumulative gas produced, MMscf
 P = pressure, psia
 \bar{P} = average reservoir pressure, psia
 P_P = pseudopressure, psi2/cP
 T = temperature, °R
 z = gas compressibility factor, dimensionless

Subscripts

g = gas
i = initial
K = °K
R = °R
wf = well flowing

References

  1. Mattar, L.; Anderson, D (2005). "Dynamic Material Balance (Oil or Gas-In-Place Without Shut-Ins)" (PDF). CIPC.