Difference between revisions of "VRR"
From wiki.pengtools.com
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
+ | <div style='text-align: right;'>By Mikhail Tuzovskiy on {{REVISIONTIMESTAMP}}</div> | ||
==Brief== | ==Brief== |
Latest revision as of 05:28, 3 January 2023
Contents
By Mikhail Tuzovskiy on 20230103052823
Brief
VRR stands for voidage replacement ratio. It is the ratio of injected fluid to produced fluid at the reservoir conditions.
VRR is calculated with the current rates and on the cumulative basis VRRcum.
Equation
where
- = Gas formation volume factor, m3/m3
- = Injected gas formation volume factor at reservoir pressure, m3/m3
- = Injected water formation volume factor, m3/m3
- = Produced water formation volume factor, m3/m3
- = Oil formation volume factor, m3/m3
- = Produced gas oil ratio, m3/m3
- = Injected gas volume, m3
- = Oil produced, m3
- = Solution gas oil ratio, m3/m3
- = Voidage replacement ratio, fraction
- = Water injected, m3
- = Water produced, m3