Difference between revisions of "Enhancement Tracking"

From wiki.pengtools.com
Jump to: navigation, search
(Brief)
 
(34 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
==Brief==
 
==Brief==
[[Enhancement Tracking]] is a workflow to track and evaluate the benefits of executed [[Enhancement |Enhancements]].
+
[[Enhancement Tracking]] is a workflow to assess the benefits achieved by executed [[Enhancement | Enhancements]] <ref name = PrudhoeBay/>.
  
As a result [[Enhancement Tracking]] provides a '''Scorpion Plot''' which is '''$/bbl''' metrics of [[Enhancement |Enhancements]] done.
+
As a result [[Enhancement Tracking]] provides a '''Scorpion Plot''' which answers those questions:
  
It provides the answers those questions:
+
*What is the campaign total incremental oil recovery [IOR] vs total cost?
* How much was spend on the campaign?
+
*Which enhancement campaign has better '''$/bbl''' performance?
*What is the incremental oil recovery for each well and total?
+
*Which well has better '''$/bbl''' performance?
*Which campaign has better $/bbl performance?
+
*What is the [[IOR]] for each enhancement?
*Which enhancement has better $/bbl performance?
 
  
 
[[File:Scorpion plot E&P.png| Scorpion plot]]
 
[[File:Scorpion plot E&P.png| Scorpion plot]]
Line 35: Line 34:
  
 
[[File:Scorpion plot.png| Scorpion plot |600px]]<ref name = Innovator12 />
 
[[File:Scorpion plot.png| Scorpion plot |600px]]<ref name = Innovator12 />
 +
 +
==Case Study==
 +
This Case Study demonstrates the application of the [[Enhancement Tracking]] workflow using the [[:Category:E&P Portal | E&P Portal]].
 +
 +
The Study is based on the enhancement campaign implemented in an oil field located in Siberia, Russia. The campaign included such [[Enhancement | Enhancements]] as fracturing, installing and upgrading the ESPs, choke opens and resulted in '''4 mln bbl''' of incremental oil recovery.
 +
 +
It is shown how to:
 +
*Input the required data to the [[:Category:E&P Portal | E&P Portal]];
 +
*Apply the [[Enhancement Tracking]] workflow to track and benchmark enhancements;
 +
*Save and export the analysis results.
 +
 +
All the input and output data is attached to the Case Study for the reference.
 +
 +
[[File:Enhancment_Tracking_Case_Study.png|200px |link=https://wiki.pengtools.com/images/d/de/Enhancement_Tracking_CaseStudy.pdf ]]
 +
 +
[[Media:Enhancement_Tracking_CaseStudy.pdf|Download Case Study (pdf)]]
 +
 +
[[Media:Enhancement Tracking attacments.zip|Download the attachments (zip, 8 files)]]
  
 
==Workflow==
 
==Workflow==
1
+
# Open the well enhancement page
 +
# Create the decline model before the enhancement - Base Type Curve
 +
# Create the decline model after the enhancement - Enhanced Type Curve
 +
# Inspect the actual IOR vs plan
 +
# Save the model data
 +
# Move to the next well enhancement
 +
 
 +
=== Data required===
 +
*Create [[Field]] [https://ep.pengtools.com/field/index  here]
 +
*[[Upload Wells]]
 +
*[[Upload Daily Measures]]
 +
*Upload [[Enhancement| Enhancements Data]] [https://ep.dev.pengtools.com/enhancement/enhancements-tracking/upload here]
 +
 
 
== References ==
 
== References ==
 
<references>
 
<references>
Line 47: Line 76:
 
  |issue=12
 
  |issue=12
 
  |date=September-October 2006
 
  |date=September-October 2006
 +
}}</ref>
 +
 +
<ref name= PrudhoeBay>{{cite journal
 +
|last1= Martins |first1=J. P.
 +
|last2= MacDonald |first2=J. M.
 +
|last3= Stewart |first3=C. G.
 +
|last4= Phillips |first4=C. J.
 +
|title=The Management and Optimization of a Major Wellwork Program at Prudhoe Bay
 +
|publisher=Society of Petroleum Engineers
 +
|number=SPE-30649-MS
 +
|date=1995
 +
|url=https://www.onepetro.org/conference-paper/SPE-30649-MS
 +
|url-access=registration
 
}}</ref>
 
}}</ref>
  
 
</references>
 
</references>
 +
 +
Martins, J. P., MacDonald, J. M., Stewart, C. G., & Phillips, C. J. (1995, January 1). The Management and Optimization of a Major Wellwork Program at Prudhoe Bay. Society of Petroleum Engineers. doi:10.2118/30649-MS
 +
 
[[Category:Enhancement List]]
 
[[Category:Enhancement List]]
 
[[Category:E&P Portal]]
 
[[Category:E&P Portal]]
 +
 +
{{#seo:
 +
|title=Enhancement Tracking
 +
|titlemode= replace
 +
|keywords=Enhancement Tracking, oil and gas
 +
|description=Enhancement Tracking is a workflow to assess the benefits achieved by executed enhancements.
 +
}}

Latest revision as of 09:34, 6 December 2018

Brief

Enhancement Tracking is a workflow to assess the benefits achieved by executed Enhancements [1].

As a result Enhancement Tracking provides a Scorpion Plot which answers those questions:

  • What is the campaign total incremental oil recovery [IOR] vs total cost?
  • Which enhancement campaign has better $/bbl performance?
  • Which well has better $/bbl performance?
  • What is the IOR for each enhancement?

Scorpion plot

Scorpion plot for different Enhancements at the E&P Portal

Math and Physics

The incremental oil recovery (IOR) for the given Enhancement is:

IOR=V2\  - V1\ - V3

where:

V2 - production increase due to Enhancement,
V1 - production loss due to downtime,
V3 - production loss due to decline rate.

IOR is calculated to selected Enhancement lifetime or economic limit.

Decline Curves are used to model base (before) and enhanced (after) well rates.

Enhancement Tracking[2]

Scorpion Plot

The Scorpion plot graphically illustrates total program split by individual events and ranked by success. The curve initiates from the origin at a low scope (low $/bbl) and increasing until running to a vertical asymptote (money spent with no gain in production) and possibly even a negative portion (money spent and production lost as a result of the intervention). This effectively displays program performance ($/bbl), total volume, total cost, and success rate [2].

Scorpion plot[2]

Case Study

This Case Study demonstrates the application of the Enhancement Tracking workflow using the E&P Portal.

The Study is based on the enhancement campaign implemented in an oil field located in Siberia, Russia. The campaign included such Enhancements as fracturing, installing and upgrading the ESPs, choke opens and resulted in 4 mln bbl of incremental oil recovery.

It is shown how to:

  • Input the required data to the E&P Portal;
  • Apply the Enhancement Tracking workflow to track and benchmark enhancements;
  • Save and export the analysis results.

All the input and output data is attached to the Case Study for the reference.

Enhancment Tracking Case Study.png

Download Case Study (pdf)

Download the attachments (zip, 8 files)

Workflow

  1. Open the well enhancement page
  2. Create the decline model before the enhancement - Base Type Curve
  3. Create the decline model after the enhancement - Enhanced Type Curve
  4. Inspect the actual IOR vs plan
  5. Save the model data
  6. Move to the next well enhancement

Data required

References

  1. Martins, J. P.; MacDonald, J. M.; Stewart, C. G.; Phillips, C. J. (1995). "The Management and Optimization of a Major Wellwork Program at Prudhoe Bay"Free registration required (SPE-30649-MS). Society of Petroleum Engineers. 
  2. 2.0 2.1 2.2 Nguyen, Dzu (September–October 2006). "Improving Performance Management in TNK-BP". Innovator, TNK-BP Technology Magazine (12). 

Martins, J. P., MacDonald, J. M., Stewart, C. G., & Phillips, C. J. (1995, January 1). The Management and Optimization of a Major Wellwork Program at Prudhoe Bay. Society of Petroleum Engineers. doi:10.2118/30649-MS