Difference between revisions of "CAPEX"
From wiki.pengtools.com
(Created page with "<table border="1" > <tr><td>1</td><td> Well construction</td></tr> <tr><td>1a</td><td> Production well construction</td></tr> <tr><td>1b</td><td> Exploration well...") |
|||
(9 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | ==Capital Expenditures== | ||
+ | |||
+ | [[AFE]] is prepared for [[CAPEX]]. | ||
+ | |||
+ | ===CAPEX codes=== | ||
<table border="1" > | <table border="1" > | ||
<tr><td>1</td><td> Well construction</td></tr> | <tr><td>1</td><td> Well construction</td></tr> | ||
Line 35: | Line 40: | ||
<tr><td>5b</td><td> Software</td></tr> | <tr><td>5b</td><td> Software</td></tr> | ||
</table> | </table> | ||
+ | |||
+ | [[Category:E&P Finance]] |
Latest revision as of 19:54, 27 January 2017
Capital Expenditures
AFE is prepared for CAPEX.
CAPEX codes
1 | Well construction |
1a | Production well construction |
1b | Exploration well construction |
1c | Wells enhancement operations |
1d | IPM/consultant service |
2 | Infrastructure construction |
2a | Sale oil/gas Pipelines construction |
2b | Infield pipelines construction |
2c | Power facilities |
2d | Power lines construction |
2e | Road construction |
2f | Water injection/treatment |
2g | Pad construction/development/ equipping |
2h | Oil treatment facilities |
2i | Household purpose facilities |
2j | IT and telecommunication systems |
2k | Surface and drilling permitting and design projects |
2l | Other construction projects |
2m | Industrial buildings and facilities |
3 | Geological capital expenditures |
3a | Seismic operations |
3b | Production testing operations |
3c | Project documentation reserves |
3d | Field development plan |
3e | Geological modeling |
4 | Purchase of fixed assets |
4a | Field vehicles |
4b | Production facilities |
4c | Office buildings |
4d | Office machines |
4e | Office furniture |
5 | Purchase of intangible assets |
5a | Licenses |
5b | Software |