Difference between revisions of "Reservoir Management"
From wiki.pengtools.com
Line 35: | Line 35: | ||
{{Data required for Reservoir Management}} | {{Data required for Reservoir Management}} | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
[[Category:Reservoir Management]] | [[Category:Reservoir Management]] | ||
[[Category:E&P Portal]] | [[Category:E&P Portal]] |
Revision as of 13:13, 13 December 2017
Reservoir Management
Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.
Reservoir Management is applied to the Reservoirs / Objects on a Fields level.
Reservoir Management uses Monthly Measures for production/injection data.
Workflow
- Upload required data
- Completions check
- Group Reservoirs to Objects if needed
- Review Performance Plots
- Identify Reservoirs / Objects with performance gaps
- Apply the Mature Water Flood Analysis if needed
- Identify the actions required to enhance Reservoirs / Objects production and recovery
- Calculate the Reservoirs / Objects production and recovery forecasts
- Execute
Repeat the steps routinely (monthly, quarterly, half year).
Data required
- Create Field here
- Upload Wells
- Create or Upload Reservoirs here
- Upload Monthly Measures here
- Input the Reservoirs reserves and other data here
- Create or Upload PVT (SG, Pi, Ti) here
In case you need to calculate the Monthly Measures from the Daily Measures:
- Upload Wells
- Upload Daily Measures
- Calculate the Monthly Measures using Monthly Measures Calculator