Difference between revisions of "Reservoir Management"

From wiki.pengtools.com
Jump to: navigation, search
(Data required)
Line 33: Line 33:
 
Repeat the steps routinely (monthly, quarterly, half year).
 
Repeat the steps routinely (monthly, quarterly, half year).
 
==== Data required====
 
==== Data required====
 +
 +
{{Data required for Reservoir Management}}
 +
 
* Create [[Field]] [https://ep.pengtools.com/field/index  here]
 
* Create [[Field]] [https://ep.pengtools.com/field/index  here]
 
* Upload [[Well]]s [https://ep.pengtools.com/well/upload  here]
 
* Upload [[Well]]s [https://ep.pengtools.com/well/upload  here]

Revision as of 13:10, 13 December 2017

Reservoir Management

Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.

Reservoir Management is applied to the Reservoirs / Objects on a Fields level.

Reservoir Management uses Monthly Measures for production/injection data.

Reservoir Management: History Plot
Reservoir Management Table

Workflow

  1. Upload required data
  2. Completions check
  3. Group Reservoirs to Objects if needed
  4. Review Performance Plots
    1. History Plot
    2. Cumulative Production Plots
    3. WOR vs Np Plot
    4. VRR Plot
    5. VRRcum Plot
    6. P/Z plot
  5. Identify Reservoirs / Objects with performance gaps
  6. Apply the Mature Water Flood Analysis if needed
  7. Identify the actions required to enhance Reservoirs / Objects production and recovery
  8. Calculate the Reservoirs / Objects production and recovery forecasts
  9. Execute


Repeat the steps routinely (monthly, quarterly, half year).

Data required

In case you need to calculate the Monthly Measures from the Daily Measures:

In case you need to calculate the Monthly Measures from the Daily Measures: