Difference between revisions of "Reservoir Management"

From wiki.pengtools.com
Jump to: navigation, search
(Redirected page to Category:Reservoir Management)
 
(46 intermediate revisions by one other user not shown)
Line 1: Line 1:
__TOC__
+
#REDIRECT [[Category:Reservoir_Management]]
 
 
==Reservoir Management==
 
 
 
[[Reservoir Management]] is a Reservoir Engineering workflow focused on [[Reservoirs]] hydrocarbons recovery performance.
 
 
 
[[Reservoir Management]] is applied to the  [[Reservoirs]] / [[Object]]s on a [[Field]]s level.
 
 
 
[[Reservoir Management]] uses [[Monthly Measures]] for production/injection data.
 
 
 
 
 
===Workflow===
 
#Upload required data
 
#[[Completions check]]
 
#Create [[Object]]s if needed
 
#Review Plots
 
##History Plot
 
##Cumulative Oil Production Plot
 
##[[WOR vs Np]] Plot
 
##[[VRR]] Plot
 
##[[VRRcum]] Plot
 
#Identify [[Reservoirs]] / [[Object]]s with performance gaps
 
#Continue with the [[Mature Water Flood Analysis]] for [[Reservoirs]] / [[Object]]s with low performance
 
 
 
====1. Data required====
 
*Create [[Field]]s
 
*Upload [[Reservoirs]]
 
*Upload [[PVT]]
 
*Upload [[Well]]s
 
*Upload [[Monthly Measures]]
 
 
 
[[Category:Reservoir Management]]
 

Latest revision as of 12:17, 25 December 2017