Difference between revisions of "Reservoir Management"

From wiki.pengtools.com
Jump to: navigation, search
(Workflow)
(Workflow)
Line 29: Line 29:
 
#Calculate the [[Reservoirs]] / [[Object]]s production and recovery forecasts
 
#Calculate the [[Reservoirs]] / [[Object]]s production and recovery forecasts
  
Repeat steps 5-6-7-8-9-10 routinely (monthly, quarterly, half year).
+
 
 +
Repeat steps 2-3-4-5-6-7 routinely (monthly, quarterly, half year).
 
====1. Data required====
 
====1. Data required====
 
*Create [[Field]]s
 
*Create [[Field]]s

Revision as of 10:57, 21 November 2017

Reservoir Management

Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.

Reservoir Management is applied to the Reservoirs / Objects on a Fields level.

Reservoir Management uses Monthly Measures for production/injection data.

Reservoir Management: History Plot
Reservoir Management Table

Workflow

  1. Upload required data
  2. Completions check
  3. Group Reservoirs to Objects if needed
  4. Review Performance Plots
    1. History Plot
    2. Cumulative Production Plots
    3. WOR vs Np Plot
    4. VRR Plot
    5. VRRcum Plot
    6. P/Z plot
  5. Identify Reservoirs / Objects with performance gaps
  6. Apply the Mature Water Flood Analysis if needed
  7. Identify the actions required to enhance Reservoirs / Objects production and recovery
  8. Calculate the Reservoirs / Objects production and recovery forecasts


Repeat steps 2-3-4-5-6-7 routinely (monthly, quarterly, half year).

1. Data required