Difference between revisions of "Petroleum Engineering Timeline"

From wiki.pengtools.com
Jump to: navigation, search
(Brief)
Line 6: Line 6:
 
From the first well drilled, first PVT correlation, first multiphase flow correlation, through the first computer to the modern reservoir simulator.
 
From the first well drilled, first PVT correlation, first multiphase flow correlation, through the first computer to the modern reservoir simulator.
  
[[File:Petroleum Engineering Timeline.png|thumb|right|600px|link=http://www.pengtools.com/pvtCalculator|Oil viscosity in the PVT Tool]]
+
[[File:Petroleum Engineering Timeline.png|thumb|600px|link=http://www.pengtools.com/pvtCalculator|Oil viscosity in the PVT Tool]]
  
 
===Timeline===
 
===Timeline===
Line 14: Line 14:
  
 
[[Category:pengtools]]
 
[[Category:pengtools]]
 +
[[Category:Technology]]

Revision as of 12:07, 28 July 2017

Brief

Petroleum Engineering Timeline is a timeline which describes the evolution of the Petroleum Engineering over time.

From the first well drilled, first PVT correlation, first multiphase flow correlation, through the first computer to the modern reservoir simulator.

Oil viscosity in the PVT Tool

Timeline