Difference between revisions of "Completion"

From wiki.pengtools.com
Jump to: navigation, search
Line 13: Line 13:
 
*AB, AC, BC, ABC - commingled [[Reservoirs]] [[Completion]]s
 
*AB, AC, BC, ABC - commingled [[Reservoirs]] [[Completion]]s
  
The sum of production/injection volumes of the [[Wells]] with the same [[Completion]] is defined as [[Completion]] production/injection volume.
+
The sum of production/injection volumes of all the [[Wells]] with the same [[Completion]] is defined as [[Completion]] production/injection volume.
  
 
[[File: Completion.png|800px|Completion]]
 
[[File: Completion.png|800px|Completion]]
  
 
[[Category:Reservoir Management]]
 
[[Category:Reservoir Management]]

Revision as of 16:28, 6 March 2017

Completion

Completion is defined as a connection of the Wells to the Reservoirs.

Usually the connection is created through the Perforations.

Any combination of producing Reservoirs in one Field can be defined as Completion.

For example if the Field has Reservoirs: A, B, C producing, then the possible Completions are: A, B, C, AB, AC, BC, ABC where:

  • AB, AC, BC, ABC - commingled Reservoirs Completions

The sum of production/injection volumes of all the Wells with the same Completion is defined as Completion production/injection volume.

Completion