It's just a folklore, "field experience", stories, testimonials, gossip etc.
 
It's just a folklore, "field experience", stories, testimonials, gossip etc.
  
The performance based organization rule is: all enhancement opportunities are pursued unless somebody proves the opposite with the math and physics.
+
== The performance based organization rule is: ==
 +
 
 +
All enhancement opportunities are pursued unless somebody proves the opposite with the math and physics.
  
 
[[Category:Technology]]
 
[[Category:Technology]]

Revision as of 10:51, 17 April 2017

To safe time pick a number (multiple numbers are acceptable)

1) It's all foam and the well is pumped off!!!

2) Can not produce below the bubble point: IPR curve reverses

3) The hole is too deviated and pumps don't work inlined

4) Pulling the chokes will make production decrease

5) Scale will form

6) Water will break through sooner

7) Anaerobic bacteria will grow at the perforations

8) Facility is full

9) Oil bubbles through water at 30 t/d; the physical production limit

10) Sharp decline of base production

11) Will damage the Reservoir

12) Bad Sucker Rods

13) We don't have big pumps

14) Production below the bubble point will foul the ESP with gas

15) Ran out of cable

16) Bigger pump will cause interference with adjacent wells decreasing total production

17) It's on order but won't be here for at least 2 months

18) Hydrates

19) Not enough electricity for a bigger pump

20) Casing collapse

21) FRACs go away

22) Every well has a right to life

23) Casing is too small

24) Pumps will burn up

25) Cannot increase the frequency because of vibration

26) Cannot commingle sandstones and carbonates

27) Cannot commingle because different waters will precipitate salt

28) Can not increase production as we have no money for helicopter gasoline

29) Not enough gas is being produced to cool the pump (not enough Joules-Thomson)

30) Material balance does not work

31) Velocity of the nozzle of the separator will increase

32) We don't open chokes on weekends

33) It's Easter time

34) This physical law works good in the theory, but can be applied to the real fields we have here.

Discussion

Sounds familiar?

All of those are the real world excuses given by the people in the oil an gas industry why not to increase production.

People who say something like this usually has no math and physics done to support what they are saying.

It's just a folklore, "field experience", stories, testimonials, gossip etc.

The performance based organization rule is:

All enhancement opportunities are pursued unless somebody proves the opposite with the math and physics.