Enhancement

From wiki.pengtools.com
Revision as of 13:31, 24 July 2018 by MishaT (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Brief

Enhancement is an action to close the performance gap of the Well, Block, Pattern or a Reservoir.

Enhancement has associated cost and results in the incremental oil recovery (IOR).

In the E&P Portal Enhancements are identified by the Enhancement List.

In the E&P Portal Enhancements are tracked by the Enhancement Tracking.

Well Enhancements

From most $/bbl effective to least:

  • Choke open
  • Pump Optimization
  • ESP (converting the flowing well to ESP; upgrading the ESP etc)
  • Acid Job
  • Reperforation
  • Frac
  • Multistage Frac
  • Sidetrack
  • Drilling New Well

Example:

Enhancement example: Converting the Flowing well to the ESP

Enhancement example: Converting the Flowing well to the ESP

Block, Pattern, Reservoir Enhancements

  • Well Enhancement
  • Convert producing well to injector
  • Shut in inefficient injection well
  • Increase/Decrease well injection rate
  • Add/squeeze Perforations at producing or injection wells
  • Drilling the infill production/injection well

Enhancements parameters

  • Date
  • Type of enhancement
  • Cost
  • Well Stop Date (actual and planned)
  • Well Start Date (actual and planned)
  • Enhancement design report
  • Well Production Forecast