Gas Flowing Material Balance

From wiki.pengtools.com
Revision as of 12:36, 24 November 2017 by MishaT (talk | contribs)
Jump to: navigation, search

Brief

Gas Flowing Material Balance is the advanced engineering technique to determine the Reservoirs GIIP and recovery as well as Well's EUR and JD.

Gas Flowing Material Balance is applied on the Well level given readily available well flowing data: production rate and tubing head pressure.

Math & Physics

Combining the gas pseudo state flow equation and the Gas Material Balance equation:

 P_{\bar{P}}= P_{P_{wf}} + q_g b_{pss} [1]

where

 b_{pss} = \frac{1422 \times 10^3\ T_R}{kh\ J_D}

Material balance pseudo-time:

 t_{ca} = \frac{\mu_{gi} c_{gi}}{q_g}\int\limits_{0}^{t}\frac{q_g}{\bar{\mu_g} \bar{c_g}}dt

Discussion

Workflow

References

  1. Mattar, L.; Anderson, D (2005). "Dynamic Material Balance (Oil or Gas-In-Place Without Shut-Ins)" (PDF). CIPC.