Reservoir Management

From wiki.pengtools.com
Revision as of 10:51, 21 November 2017 by MishaT (talk | contribs) (Workflow)
Jump to: navigation, search

Reservoir Management

Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.

Reservoir Management is applied to the Reservoirs / Objects on a Fields level.

Reservoir Management uses Monthly Measures for production/injection data.

Reservoir Management: History Plot
Reservoir Management Table

Workflow

  1. Upload required data
  2. Completions check
  3. Group Reservoirs to Objects if needed
  4. Review Performance Plots
    1. History Plot
    2. Cumulative Production Plots
    3. WOR vs Np Plot
    4. VRR Plot
    5. VRRcum Plot
    6. P/Z plot
  5. Identify Reservoirs / Objects with performance gaps
  6. Continue with the Mature Water Flood Analysis applied to Reservoirs / Objects with low performance
  7. Calculate the production and recovery forecast

1. Data required