Difference between revisions of "Enhancement"

From wiki.pengtools.com
Jump to: navigation, search
(Brief)
 
Line 39: Line 39:
 
* Add/squeeze Perforations at producing or injection wells
 
* Add/squeeze Perforations at producing or injection wells
 
* Drilling the infill production/injection well
 
* Drilling the infill production/injection well
 +
 +
== [[Enhancement |Enhancements]] parameters==
 +
*Date
 +
*Type of enhancement
 +
*Cost
 +
*Well Stop Date (actual and planned)
 +
*Well Start Date (actual and planned)
 +
*Enhancement design report
 +
*Well Production Forecast
  
  
 
[[Category:Enhancement List]]
 
[[Category:Enhancement List]]
 
[[Category:E&P Portal]]
 
[[Category:E&P Portal]]

Latest revision as of 13:31, 24 July 2018

Brief

Enhancement is an action to close the performance gap of the Well, Block, Pattern or a Reservoir.

Enhancement has associated cost and results in the incremental oil recovery (IOR).

In the E&P Portal Enhancements are identified by the Enhancement List.

In the E&P Portal Enhancements are tracked by the Enhancement Tracking.

Well Enhancements

From most $/bbl effective to least:

  • Choke open
  • Pump Optimization
  • ESP (converting the flowing well to ESP; upgrading the ESP etc)
  • Acid Job
  • Reperforation
  • Frac
  • Multistage Frac
  • Sidetrack
  • Drilling New Well

Example:

Enhancement example: Converting the Flowing well to the ESP

Enhancement example: Converting the Flowing well to the ESP

Block, Pattern, Reservoir Enhancements

  • Well Enhancement
  • Convert producing well to injector
  • Shut in inefficient injection well
  • Increase/Decrease well injection rate
  • Add/squeeze Perforations at producing or injection wells
  • Drilling the infill production/injection well

Enhancements parameters

  • Date
  • Type of enhancement
  • Cost
  • Well Stop Date (actual and planned)
  • Well Start Date (actual and planned)
  • Enhancement design report
  • Well Production Forecast