Difference between revisions of "P/Z plot"
(→Discussion) |
(→Nomenclature) |
||
Line 40: | Line 40: | ||
== Nomenclature == | == Nomenclature == | ||
− | :<math> GIIP </math> = gas initially in place, | + | :<math> GIIP </math> = gas initially in place, scf |
+ | :<math> G_p </math> = cumulative gas produced, scf | ||
:<math> P </math> = reservoir pressure (changing), psia | :<math> P </math> = reservoir pressure (changing), psia | ||
:<math> P_{i} </math> = initial reservoir pressure (constant), psia | :<math> P_{i} </math> = initial reservoir pressure (constant), psia |
Revision as of 11:23, 21 November 2017
Brief
The P/Z plot is a plot of P/z versus cumulative gas production, Gp.
The interpretation technique is fitting the data points with the straight line to estimate GIIP.
The P/Z plot is based on the Gas Material Balance equation.
Math & Physics
Applying Real Gas EOS at reservoir conditions:
(1)
Applying Real Gas EOS at standard conditions:
(2)
Dividing eq. 2 by eq. 1 and rearranging:
(3)
Applying eq. 3 for initial conditions and for any point in time:
Applying eq. 3 for any point in time:
Therefore at any time:
Or:
Thus a plot of P/z vs cumulative produced gas is a straight line intersecting X axis at GIIP.
Discussion
P/Z plot is a part of the Reservoir Management workflow of the E&P Portal to estimate Reservoirs GIIP.
Gas Flowing Material Balance is the more advanced tool to determine the Reservoirs GIIP as well as Well's EUR and JD.
Nomenclature
= gas initially in place, scf
= cumulative gas produced, scf
= reservoir pressure (changing), psia
= initial reservoir pressure (constant), psia
= pressure at standard conditions, psia
= initial reservoir pressure (constant), °R
= reservoir pressure (constant), °R
= temperature at standard conditions (constant), °R
= volume of gas in reservoir converted to standard conditions (changing), ft3
= reservoir volume (constant), ft3
= gas compressibility factor (changing), dimensionless