Difference between revisions of "Reservoir Management"

From wiki.pengtools.com
Jump to: navigation, search
(Workflow)
(Workflow)
Line 26: Line 26:
 
#Identify [[Reservoirs]] / [[Object]]s with performance gaps
 
#Identify [[Reservoirs]] / [[Object]]s with performance gaps
 
#Continue with the [[Mature Water Flood Analysis]] applied to [[Reservoirs]] / [[Object]]s with low performance
 
#Continue with the [[Mature Water Flood Analysis]] applied to [[Reservoirs]] / [[Object]]s with low performance
 
+
#Calculate the production and recovery forecast
 
====1. Data required====
 
====1. Data required====
 
*Create [[Field]]s
 
*Create [[Field]]s

Revision as of 10:51, 21 November 2017

Reservoir Management

Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.

Reservoir Management is applied to the Reservoirs / Objects on a Fields level.

Reservoir Management uses Monthly Measures for production/injection data.

Reservoir Management: History Plot
Reservoir Management Table

Workflow

  1. Upload required data
  2. Completions check
  3. Group Reservoirs to Objects if needed
  4. Review Performance Plots
    1. History Plot
    2. Cumulative Production Plots
    3. WOR vs Np Plot
    4. VRR Plot
    5. VRRcum Plot
    6. P/Z plot
  5. Identify Reservoirs / Objects with performance gaps
  6. Continue with the Mature Water Flood Analysis applied to Reservoirs / Objects with low performance
  7. Calculate the production and recovery forecast

1. Data required