Difference between revisions of "TSO effect"
From wiki.pengtools.com
(Created page with "A fracture treatment, common where high fracture flow conductivity is needed. Very high pressures and very high proppant loadings are applied near the end of a fracture treatm...") |
|||
Line 1: | Line 1: | ||
A fracture treatment, common where high fracture flow conductivity is needed. Very high pressures and very high proppant loadings are applied near the end of a fracture treatment where the tip of the fracture has stopped growing due to bridging of proppant at the fracture dip because of dehydration (frac fluid leakoff). | A fracture treatment, common where high fracture flow conductivity is needed. Very high pressures and very high proppant loadings are applied near the end of a fracture treatment where the tip of the fracture has stopped growing due to bridging of proppant at the fracture dip because of dehydration (frac fluid leakoff). | ||
+ | |||
+ | [[Category:FracDesign]] |
Revision as of 13:46, 7 April 2017
A fracture treatment, common where high fracture flow conductivity is needed. Very high pressures and very high proppant loadings are applied near the end of a fracture treatment where the tip of the fracture has stopped growing due to bridging of proppant at the fracture dip because of dehydration (frac fluid leakoff).