Difference between revisions of "Enhancement"

From wiki.pengtools.com
Jump to: navigation, search
(Brief)
Line 24: Line 24:
 
* Sidetrack
 
* Sidetrack
 
* Drilling New Well
 
* Drilling New Well
 +
 +
[[File:Enhancement ESP.png| Enhancement example: Converting the Flowing well to the ESP|link=https://ep.pengtools.com/enhancement/enhancements-tracking/analyze?WellEnhancementFilter%5Bcountry_id%5D=&WellEnhancementFilter%5Bfield_id%5D=&WellEnhancementFilter%5Bwell_id%5D=29283&WellEnhancementFilter%5Benhancements_tracking_id%5D=&WellEnhancementFilter%5Benhancements_tracking_id%5D%5B%5D=17&WellEnhancementFilter%5BneedToLoad%5D=1]]
 +
 +
<center>Enhancement example: Converting the Flowing well to the ESP</center>
  
 
== Block, Pattern, Reservoir [[Enhancement |Enhancements]] ==
 
== Block, Pattern, Reservoir [[Enhancement |Enhancements]] ==

Revision as of 11:31, 10 July 2018

Brief

Enhancement is an action to close the performance gap of the Well, Block, Pattern or a Reservoir.

Enhancement has associated cost and results in incremental oil recovery (IOR).

In the E&P Portal Enhancements are identified by the Enhancement List Workflow.

In the E&P Portal Enhancements are tracked by the Enhancement Tracking Workflow.

Well Enhancements

From most $/bbl effective to least:

  • Choke open
  • Pump Optimization
  • ESP (converting the flowing well to ESP; upgrading the ESP etc)
  • Acid Job
  • Reperforation
  • Frac
  • Multistage Frac
  • Sidetrack
  • Drilling New Well

Enhancement example: Converting the Flowing well to the ESP

Enhancement example: Converting the Flowing well to the ESP

Block, Pattern, Reservoir Enhancements

  • Well Enhancement
  • Convert producing well to injector
  • Shut in inefficient injection well
  • Increase/Decrease well injection rate
  • Add/squeeze Perforations at producing or injection wells
  • Drilling the infill production/injection well