Difference between revisions of "Gas Flowing Material Balance"

From wiki.pengtools.com
Jump to: navigation, search
(Math & Physics)
(Math & Physics)
Line 11: Line 11:
  
 
:<math> P_{\bar{P}}= P_{P_{wf}} + q b_{pss}</math> <ref name=Mattar2005/>
 
:<math> P_{\bar{P}}= P_{P_{wf}} + q b_{pss}</math> <ref name=Mattar2005/>
 +
 +
where
  
 
:<math> b_{pss} = \frac{1422 \times 10^3\ T_R}{kh\ J_D}</math>
 
:<math> b_{pss} = \frac{1422 \times 10^3\ T_R}{kh\ J_D}</math>

Revision as of 13:13, 23 November 2017

Brief

Gas Flowing Material Balance is the advanced engineering technique to determine the Reservoirs GIIP and recovery as well as Well's EUR and JD.

Gas Flowing Material Balance is applied on the Well level given readily available well flowing data: production rate and tubing head pressure.

Math & Physics

Combining the gas pseudo state equation with the Gas Material Balance equation:

 P_{\bar{P}}= P_{P_{wf}} + q b_{pss} [1]

where

 b_{pss} = \frac{1422 \times 10^3\ T_R}{kh\ J_D}

References

  1. Mattar, L.; Anderson, D (2005). "Dynamic Material Balance (Oil or Gas-In-Place Without Shut-Ins)" (PDF). CIPC.