Difference between revisions of "Gas Flowing Material Balance"

From wiki.pengtools.com
Jump to: navigation, search
(Brief)
(Brief)
Line 4: Line 4:
 
[[Gas Flowing Material Balance]] is the advanced engineering technique to determine the [[Reservoirs]] GIIP and recovery as well as [[Well]]'s [[EUR]] and [[JD]].
 
[[Gas Flowing Material Balance]] is the advanced engineering technique to determine the [[Reservoirs]] GIIP and recovery as well as [[Well]]'s [[EUR]] and [[JD]].
  
[[Gas Flowing Material Balance]] is applied on the [[Well]]s level given readily available well flowing data: production rate and tubing head pressure.
+
[[Gas Flowing Material Balance]] is applied on the [[Well]] level given readily available well flowing data: production rate and tubing head pressure.
  
 
== Math & Physics ==
 
== Math & Physics ==

Revision as of 12:04, 23 November 2017

Brief

Gas Flowing Material Balance is the advanced engineering technique to determine the Reservoirs GIIP and recovery as well as Well's EUR and JD.

Gas Flowing Material Balance is applied on the Well level given readily available well flowing data: production rate and tubing head pressure.

Math & Physics