Difference between revisions of "Reservoir Management"

From wiki.pengtools.com
Jump to: navigation, search
Line 22: Line 22:
 
##[[VRRcum]] Plot
 
##[[VRRcum]] Plot
 
#Identify [[Reservoirs]] / [[Object]]s with performance gaps
 
#Identify [[Reservoirs]] / [[Object]]s with performance gaps
#Continue with the [[Mature Water Flood Analysis]] for [[Reservoirs]] / [[Object]]s with low performance
+
#Continue with the [[Mature Water Flood Analysis]] applied to [[Reservoirs]] / [[Object]]s with low performance
  
 
====1. Data required====
 
====1. Data required====

Revision as of 12:31, 3 February 2017

Reservoir Management

Reservoir Management is a Reservoir Engineering workflow focused on Reservoirs hydrocarbons recovery performance.

Reservoir Management is applied to the Reservoirs / Objects on a Fields level.

Reservoir Management uses Monthly Measures for production/injection data.

MWFA

Workflow

  1. Upload required data
  2. Completions check
  3. Group Reservoirs to Objects if needed
  4. Review Performance Plots
    1. History Plot
    2. Cumulative Oil Production Plot
    3. WOR vs Np Plot
    4. VRR Plot
    5. VRRcum Plot
  5. Identify Reservoirs / Objects with performance gaps
  6. Continue with the Mature Water Flood Analysis applied to Reservoirs / Objects with low performance

1. Data required