Difference between revisions of "Reservoir Management"
From wiki.pengtools.com
Line 5: | Line 5: | ||
[[Reservoir Management]] is a Reservoir Engineering workflow focused on [[Reservoirs]] hydrocarbons recovery performance. | [[Reservoir Management]] is a Reservoir Engineering workflow focused on [[Reservoirs]] hydrocarbons recovery performance. | ||
− | [[Reservoir Management]] is applied to the [[ | + | [[Reservoir Management]] is applied on a [[Field]]s level to the [[Reservoirs]] / [[Object]]s. |
+ | |||
+ | [[Reservoir Management]] uses [[Monthly Measures]] for production/injection data. | ||
Line 18: | Line 20: | ||
##[[VRR]] Plot | ##[[VRR]] Plot | ||
##[[VRRcum]] Plot | ##[[VRRcum]] Plot | ||
− | #Identify [[Reservoirs]] with performance gaps | + | #Identify [[Reservoirs]] / [[Object]]s with performance gaps |
− | #Continue with the [[Mature Water Flood Analysis]] for [[Reservoirs]] with low performance | + | #Continue with the [[Mature Water Flood Analysis]] for [[Reservoirs]] / [[Object]]s with low performance |
====1. Data required==== | ====1. Data required==== |
Revision as of 11:46, 3 February 2017
Reservoir Management
Reservoir Management is a Reservoir Engineering workflow focused on Reservoirs hydrocarbons recovery performance.
Reservoir Management is applied on a Fields level to the Reservoirs / Objects.
Reservoir Management uses Monthly Measures for production/injection data.
Workflow
- Upload required data
- Completions check
- Create Objects if needed
- Review Plots
- Identify Reservoirs / Objects with performance gaps
- Continue with the Mature Water Flood Analysis for Reservoirs / Objects with low performance
1. Data required
- Create Fields
- Upload Reservoirs
- Upload PVT
- Upload Wells
- Upload Monthly Measures