Difference between revisions of "Reservoir Management"

From wiki.pengtools.com
Jump to: navigation, search
Line 5: Line 5:
 
[[Reservoir Management]] is a Reservoir Engineering workflow focused on [[Reservoirs]] hydrocarbons recovery performance.
 
[[Reservoir Management]] is a Reservoir Engineering workflow focused on [[Reservoirs]] hydrocarbons recovery performance.
  
[[Reservoir Management]] is applied to the [[Field]]s and uses [[Monthly Measures]] for production/injection data.
+
[[Reservoir Management]] is applied on a [[Field]]s level to the [[Reservoirs]] / [[Object]]s.
 +
 
 +
[[Reservoir Management]] uses [[Monthly Measures]] for production/injection data.
  
  
Line 18: Line 20:
 
##[[VRR]] Plot
 
##[[VRR]] Plot
 
##[[VRRcum]] Plot
 
##[[VRRcum]] Plot
#Identify [[Reservoirs]] with performance gaps
+
#Identify [[Reservoirs]] / [[Object]]s with performance gaps
#Continue with the [[Mature Water Flood Analysis]] for [[Reservoirs]] with low performance
+
#Continue with the [[Mature Water Flood Analysis]] for [[Reservoirs]] / [[Object]]s with low performance
  
 
====1. Data required====
 
====1. Data required====

Revision as of 11:46, 3 February 2017

Reservoir Management

Reservoir Management is a Reservoir Engineering workflow focused on Reservoirs hydrocarbons recovery performance.

Reservoir Management is applied on a Fields level to the Reservoirs / Objects.

Reservoir Management uses Monthly Measures for production/injection data.


Workflow

  1. Upload required data
  2. Completions check
  3. Create Objects if needed
  4. Review Plots
    1. History Plot
    2. Cumulative Oil Production Plot
    3. WOR vs Np Plot
    4. VRR Plot
    5. VRRcum Plot
  5. Identify Reservoirs / Objects with performance gaps
  6. Continue with the Mature Water Flood Analysis for Reservoirs / Objects with low performance

1. Data required