Difference between revisions of "Reservoir Management"

From wiki.pengtools.com
Jump to: navigation, search
(Workflow)
(1. Data required)
Line 32: Line 32:
  
 
Repeat the steps routinely (monthly, quarterly, half year).
 
Repeat the steps routinely (monthly, quarterly, half year).
====1. Data required====
+
==== Data required====
 
*Create [[Field]]s
 
*Create [[Field]]s
 
*Upload [[Reservoirs]]
 
*Upload [[Reservoirs]]

Revision as of 12:05, 11 December 2017

Reservoir Management

Reservoir Management is a workflow to maximize Reservoirs hydrocarbons recovery.

Reservoir Management is applied to the Reservoirs / Objects on a Fields level.

Reservoir Management uses Monthly Measures for production/injection data.

Reservoir Management: History Plot
Reservoir Management Table

Workflow

  1. Upload required data
  2. Completions check
  3. Group Reservoirs to Objects if needed
  4. Review Performance Plots
    1. History Plot
    2. Cumulative Production Plots
    3. WOR vs Np Plot
    4. VRR Plot
    5. VRRcum Plot
    6. P/Z plot
  5. Identify Reservoirs / Objects with performance gaps
  6. Apply the Mature Water Flood Analysis if needed
  7. Identify the actions required to enhance Reservoirs / Objects production and recovery
  8. Calculate the Reservoirs / Objects production and recovery forecasts
  9. Execute


Repeat the steps routinely (monthly, quarterly, half year).

Data required